|
RFQs
RFPs
1-10 Communication
Tower Inspection
Addendum
#1
2-10 Communication
Tower Engineering
3-10
Communication
Tower Surveying Addendum#1 Addendum #2;
Chart
4-10
Engineering
– Well and Septic Program
5-10 E-911
Relocation Feasibility Study
6-10
Legal
Services Department of Social Services
7-10
Hearing
officer – Health Department
8-10
Website
hosting and Maintenance
Pre-Proposal Conference
Call May 6, 2010 at
10:00 a.m.
9-10
Geo
Technical Drilling
10-10
Customer
Service training
11-10
Dam
Inspection Addendum
#1
12-10
Waterfront
Access Study
13-10
Camp
Zerbe Lodge
Evaluation
14-10
Energy
Management Personnel
15-10 Mental
Health Treatment and Evaluations
16-10
Lighting
Systems Project with attachment A
NOTE: BUNNER STREET COMPLEX
IS BOTH 70 AND 74 BUNNER ST.
Buy
American Waiver (attachment B)
Waste
Management Plan (attachment C)
Oswego
Project Description (attachment
D)
Bunner Street Floor plan
LOB,
46 E. Bridge Floor Plan
Square
Footage both buildings
ADDENDUM
#1 issued October 15 (Audits below)
Legislative
Office Building Lighting Audit
Bunner St Lighting Audit
17-10 DSS
COST ALLOCATION SERVICES
18-10
Health
Department Cost Reports Addendum
#1
19-10
Replace
Truck Scales
20-10
Roofing Estimator
21-10 NONE
22-10
Text
and Image Management
BIDs
1-10
Court-House Sound System Upgrade
2-10
Refractory Material
5-10
Airport Runway 15-33 Rehabilitation
6-10
Maintenance
of Jail Management and Control Systems at Public Safety Center
7-10
Maintenance
of Fire Protection Systems at Public Safety Center
8-10 Rental Of Highway Equipment
9-10
Airport Storage Building
10-10
Cooperative Fuel Bid
Fuel
Bid Forms
11-10 12
Sheriff Cars
12-10 Steel
Materials for Bridge Construction
13-10
Natural
Gas for Mix plant Addendum
#1
14-10
Road
Salt
15-10
Elevator
Maintenance
16-10
Panasonic
Tough books
17-10
Emergency
Communications Equipment Shelters
ADDENDUM
# 1
ADDENDUM
#2 ADDENDUM
#3
Pre-bid meeting May 6, 2010 at 1:00 p.m. 46 East bridge
street
18-10
Uniform
Rental
19-10
Guiderail
20-10 Street
Sweeper
21-10 Live
Bottom Trailer
22-10 5 CU yard
Loader
23-10
Communication
Towers – OPENING DATE CHANGED TO June 15
Drawings
1,
2,
3 Full
size drawings available in Purchasing department
Addendums: #1 Test
Boring log – Fulton Site #2 # 3
May 28. 2010 #4
June 7
**TYPO Correction: GPS coordinates for Orwell: Change 76 to 75
for the latitude**
24-10
4 Solid
Rubber Tires
25-10
Air
Conditioning Unit
26-10
Electrician
Services at Public Safety Building List
of Runs Drawings
27-10
Energy
Recovery Facility – Apron
repair
28-10
Fire Protection at Public Safety Building Bid
Withdrawn
29-10
Chassis
and Service Body
30-10
Hydrated
Lime
31-10
Carpeting at PSB Addendum 1 Addendum 2
32-10 Five
(5) or more new ¾ -ton pickup trucks
33-10 Replacement
of the County Route 48 bridge over Salmon river
ADDENDUM #1 Posted 10/9
34-10 Snowplow
Equipment
35-10
Signposts
and Extensions
36-10
Sign
Blanks
37-10
Sally
Port Repair
39-10 ONE
(1) OR MORE NEW 75 CUBIC YARD CLOSED TOP EJECTOR TRAILERS
Addendum #1 –
Change in Opening date to Friday Sept 10
40-10
One
(1) or more Excavators
41-10
Steel
Materials for bridge
42-10
Lighting System Projects
BID 42-10 WITHDRAWN, WILL BE RELEASED
AS AN RFP NOTICE
43-10
HVAC
Maintenance
ADDENDUM
#1 ADD # 2
44-10
Motor
Oils
45-10
Sale
of Scrap Metal
46-
10 Concrete
47-10 WASHED
LIMESTONE & CRUSHER RUN LIMESTONE
48-10
Timber
Bid MAP
49-10
– Communication
Tower Upgrades BID Folder of all Documents
ADDENDUM
# 1
December 10th
ADDENDUM # 2 December 20th PLEASE NOTE CHANGE IN OPENING DATE
ADDENDUM
#3 December 28th
Attachments:
PRICING SHEETS FROM JANUARY 6 OPENING BID TAB
SVOBODA ARMOR NORTHEAST ALLSTATE
SCHICKLER WESTOWER SABRE MIDSTATE
Bid 50-10
Bristol Hill Fuel Tank Replacement
Plans Available 1/4/11
Addendum #1
January 19
BID
51-10 Trash & Recyclables
ADDENDUM
#1 1/5/10
|